{"created":"2021-03-01T06:43:18.584367+00:00","id":25357,"links":{},"metadata":{"_buckets":{"deposit":"f9ff0aaf-b54e-4d94-8fe9-57e20cfdec36"},"_deposit":{"id":"25357","owners":[],"pid":{"revision_id":0,"type":"depid","value":"25357"},"status":"published"},"_oai":{"id":"oai:repository.dl.itc.u-tokyo.ac.jp:00025357","sets":["27:2466:2467:2531","9:504:2469:2532"]},"item_4_alternative_title_1":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_alternative_title":"Studies on Location of Skidding Road and Cable with Yarding and Hauling Systems of Mobile-Yarder, Processor, and Forwarder"}]},"item_4_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"2001","bibliographicIssueDateType":"Issued"},"bibliographicPageEnd":"110","bibliographicPageStart":"101","bibliographicVolumeNumber":"105","bibliographic_titles":[{"bibliographic_title":"東京大学農学部演習林報告"}]}]},"item_4_description_5":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"林道から離れた伐区において,低規格集材路を作設して,タワーヤーダ・プロセッサ・フォワーダによる集運材作業を行う場合の架線と集材路の距離について,シミュレーションを用いて作業コストを求め,比較,検討を行った。土場を一ヶ所に固定してタワーヤーダを到達補助として用いる場合を3例,複数の土場を架線の張替えを行いながら移動して集材を行う場合を2例,計5例について,次の条件により算定を行った。すなわち,伐区の大きさは小面積,中面積,大面積の3通り,形状は林道に対して間口が広い場合,奥行がある場合および正方形の場合,林道から伐区までの距離は100m,300m,500mとした。計算の結果,面積0.4haの伐区では,伐区が林道に近い場合には集材路の作設延長を最大限抑えるパターンが最も低コストとなり,伐区が林道から離れている場合には,集材路を途中まで作設するパターンが有利となった。面積0.9haの伐区では,集材路を伐区に隣接するまで作設し,一ヶ所に固定されたタワーヤーダより扇形に架線を張替えて集材を行う方式が有利となった。面積1.6haの伐区においても,伐区の間口が広い場合および正方形の場合には同様の結果となった。奥行が長い場合には,伐区の中央まで集材路を作設し,タワーヤーダを移動させながら集材を行うシステムが最も有利となった。すなわち,伐区が小さい場合には,タワーヤーダ架線の分担を大きくして作業にかかる費用を削減する方式が有利となり,伐区が大きい場合には,集材路の比率を大きくして,作業速度の向上を図る方が有利となることが明らかとなった。また,その境界は0.4haから0.9haの間に存在した。","subitem_description_type":"Abstract"},{"subitem_description":"This study was conducted to calculate the profitable location of skidding road and cable in mobile-yarder, processor, and forwarder logging system by simulation methods. Five patterns of road and cable positions were calculated under the following condition. The size of site is 0.4ha, 0.9ha, and 1.6ha, shape is oblong, square, and rectangle, distance from forest road is 100m, 300m, and 500m. For the small site, to set the mobile-yarder and the processor away from the site is the most profitable one. In the case of middle site, to construct skidding road close to the site, and not to move the mobile-yarder is profitable. In the case of large site, if the depth of the site is longer than width, to construct skidding road to the middle area of the site and to move the landing is profitable.","subitem_description_type":"Abstract"}]},"item_4_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"54256","nameIdentifierScheme":"WEKO"}],"names":[{"name":"SAKURAI, Rin"}]},{"nameIdentifiers":[{"nameIdentifier":"54257","nameIdentifierScheme":"WEKO"}],"names":[{"name":"SAKAI, Hideo"}]},{"nameIdentifiers":[{"nameIdentifier":"54258","nameIdentifierScheme":"WEKO"}],"names":[{"name":"KOBAYASHI, Hiroshi"}]}]},"item_4_publisher_20":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"東京大学大学院農学生命科学研究科附属演習林"}]},"item_4_source_id_10":{"attribute_name":"書誌レコードID","attribute_value_mlt":[{"subitem_source_identifier":"AN00162451","subitem_source_identifier_type":"NCID"}]},"item_4_source_id_8":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"03716007","subitem_source_identifier_type":"ISSN"}]},"item_4_subject_15":{"attribute_name":"日本十進分類法","attribute_value_mlt":[{"subitem_subject":"610","subitem_subject_scheme":"NDC"}]},"item_4_text_21":{"attribute_name":"出版者別名","attribute_value_mlt":[{"subitem_text_value":"The Tokyo University Forests"}]},"item_4_text_4":{"attribute_name":"著者所属","attribute_value_mlt":[{"subitem_text_value":"東京大学大学院農学生命科学研究科森林科学専攻"},{"subitem_text_value":"Department of Forest Science, Guraduate School of Agricultural and Life Sciences, The University of Tokyo"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"櫻井, 倫"}],"nameIdentifiers":[{"nameIdentifier":"54253","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"酒井, 秀夫"}],"nameIdentifiers":[{"nameIdentifier":"54254","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"小林, 洋司"}],"nameIdentifiers":[{"nameIdentifier":"54255","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2017-06-09"}],"displaytype":"detail","filename":"esrh105005.pdf","filesize":[{"value":"680.4 kB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"esrh105005.pdf","url":"https://repository.dl.itc.u-tokyo.ac.jp/record/25357/files/esrh105005.pdf"},"version_id":"14b66e3c-3a8b-4060-8426-db89125693d7"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"集材路","subitem_subject_scheme":"Other"},{"subitem_subject":"シミュレーション","subitem_subject_scheme":"Other"},{"subitem_subject":"伐区形状","subitem_subject_scheme":"Other"},{"subitem_subject":"林道から伐区までの距離","subitem_subject_scheme":"Other"},{"subitem_subject":"伐区面積","subitem_subject_scheme":"Other"},{"subitem_subject":"skidding road","subitem_subject_scheme":"Other"},{"subitem_subject":"simulation","subitem_subject_scheme":"Other"},{"subitem_subject":"shape of site","subitem_subject_scheme":"Other"},{"subitem_subject":"distance from forest road to site","subitem_subject_scheme":"Other"},{"subitem_subject":"area of site","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"タワーヤーダー・プロセッサ・フォワーダ型集運材作業システムにおける集材路と架線の検討","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"タワーヤーダー・プロセッサ・フォワーダ型集運材作業システムにおける集材路と架線の検討"}]},"item_type_id":"4","owner":"1","path":["2532","2531"],"pubdate":{"attribute_name":"公開日","attribute_value":"2012-07-17"},"publish_date":"2012-07-17","publish_status":"0","recid":"25357","relation_version_is_last":true,"title":["タワーヤーダー・プロセッサ・フォワーダ型集運材作業システムにおける集材路と架線の検討"],"weko_creator_id":"1","weko_shared_id":null},"updated":"2022-12-19T04:03:39.350814+00:00"}